Survey
Project request
Print

Stainless steel our passion & competence

Stainless steel our passion & competence

Reference list of our bridge construction projects

Example of a bridge with tension wires
Example of a bridge with tension wires
  • BAB A42, Duisburg-Hamborn
  • Bridge Hildesheim
  • Stone Bridge Regensburg
  • U12 Bridge Wolframstraße Stuttgart
  • Bridge over the A33 in the course of the Queller Straße (K 31), Steinhagen
  • Transfer in the course of the K30 near Künsebeck
  • Oker bridge Bahnhofstraße Wolfenbüttel
  • BAB A46/A44 bridge building 9 in the cross wood
  • Pedestrian bridge Ernst-Albers-Bridge in Hamburg
  • Pedestrian bridge Freiburg Ebnet
  • Bridge over the Lutter Bielefeld Milse
  • Hervester Bridge in Dortsen
  • Bridge at the Schlüter dike in Berne
  • Bridge BAB A24 in Stolpe
  • Bridge castle park in Coesfeld
  • Bridge BAB A 20 in Gützkow
  • Bridge at the Paulus-Bastei in Vechter
  • New pedestrian bridge at Stockmeyer in Füchtorf
  • BAB A40 B1 replacement construction of the Buddenacker bridge in Dortmund
  • Karl-Schmidt-Rottluf Bridge in Chemnitz
  • Bridge B 303 over the Hainberstraße BW 1-1 in the OU Stadtsteinach
  • Underground stop Landungsbrücke at the St. Pauli Landungsbrücken, at the height of bridge 1

Einsatz und Anwendung

  • Substructures as bracing framework made of stainless steel
  • Tension and deflection constructions for bracing
  • Supports, supporting and retaining structures for concrete elements and pipes
  • Ducts, gutters, sealing and clamping profiles

Projektbeschreibung

Within the scope of the rehabilitation of the A42 federal motorway in the Duisburg-Hamborn area, MODERSOHN® manufactured for the client
Straßen-NRW the deflection consoles for the Beecker Straße bridge.
These were produced from austenitic steel 1.4571.
The brackets consist of base plates with hollow profiles, which were welded from single Stainless steel sheets, provided with stiffening ribs and completed by inserted tubes.
In addition, round tubes were produced as counterparts; all blasted and welded.

The two elements are joined together to form one part, a process which has been tested once during the final production inspection to ensure that the joint functions properly.

Weld seam according to design class DIN EN 1090 EXC3 / evaluation group B

Special challenges

Manufacturing and welding work was carried out according to execution class DIN EN 1090 EXC3 / evaluation group B, including PT penetrant testing.

Further examples of bridge building projects
Support brackets for the tension wires
Support brackets for the tension wires
Further tensioning also directly under the bridge, so that tension is applied from all sides
Tension wire guides for the north bridge in Minden
Large half-timbered substructures
Truss structures with a length of approx. 14 metres
Assembled truss construction north bridge Minden
Get in contact with us.

We also have the right solution for your industry and requirements. See for yourself.

Contact us